Employment Land Review - Appendix 9 - IAMP Policy On Method Note


About this publication

This document contains appendix 9 of the Employment Land Review

The Employment Land Review is intended to provide the ÍÃ×ÓÏÈÉú with an understanding of:

  • The Borough's current position with respect to employment land supply.
  • The future need for employment land in South Tyneside over the period 2021 to 2039.

Appendix 9 contains a summary of the methodology used to complete the employment land review


Publishing information

From: Lichfields

Published: 9 March 2023

Local Plan reference: EMP1


Documents

PDF: Employment Land Review – Appendix 9 – IAMP Policy On Method Note (PDF, 460 KB)

This file has not been produced by ÍÃ×ÓÏÈÉú, and may not be suitable for users of assistive technology. If you need help to access this information within this file, please get in touch to request an accessible format.