Employment Land Review - Appendix 9 - IAMP Policy On Method Note
About this publication
This document contains appendix 9 of the Employment Land Review.
The Employment Land Review is intended to provide the ÍÃ×ÓÏÈÉú with an understanding of:
- The Borough's current position with respect to employment land supply.
- The future need for employment land in South Tyneside over the period 2021 to 2039.
Appendix 9 contains a summary of the methodology used to complete the employment land review.
Publishing information
From: Lichfields
Published: 9 March 2023
Local Plan reference: EMP1
Documents
PDF: Employment Land Review – Appendix 9 – IAMP Policy On Method Note (PDF) [460KB]
This file has not been produced by ÍÃ×ÓÏÈÉú, and may not be suitable for users of assistive technology. If you need help to access this information within this file, please get in touch to request an accessible format.