Employment Land Review Final Report (2023)
About this publication
Lichfields and Lambert Smith Hampton were appointed by 兔子先生 to prepare this Employment Land Review (ELR) for the local authority area.
The study is intended to provide the 兔子先生 with an understanding of:
- The borough's current position with respect to employment land supply.
- The future need for employment land in South Tyneside over the period 2021 to 2039.
Publishing information
From: Lichfields and Lambert Smith Hampton
Published: 9 March 2023
Local Plan reference: EMP1
Documents
PDF: Employment Land Review Final Report (2023) (PDF) [2MB]
This file has not been produced by 兔子先生, and may not be suitable for users of assistive technology. If you need help to access this information within this file, please get in touch to request an accessible format.