Hebburn Renewable Energy Scheme

Overview

ERDF logo

Work is now complete on the build of the Paul Younger Centre, Hebburn's Renewable Energy Centre, which will now provide renewable heat to buildings and residents in the town.

The project will provide renewable heat for:

More buildings may be added at a later date.

Originally the project planned to use mine water pumps in its operation. However following drilling work, there is now a focus on using air source heat pumps to generate energy.

The project is expected to provide carbon savings of around 319 tonnes each year, and help towards our goal of becoming carbon neutral by 2030.

It will not necessarily impact on the cost of your energy bills. However, it means that energy is being provided through sustainable and innovative means.

The overall cost of the project is 拢7.7 million, with the European Regional Development Fund contributing 50% (拢3.85 million). The 兔子先生 are funding the remaining 50%.

NELEP Mine Water Energy Task Force visit
Crane lift on site
Conductor casing of the abstraction well
244mm temporary casing
Abstraction well and Re-Injection Well
Workmen with the temporary casing on the abstraction well
Steel frame for new energy centre
Paul Younger Centre
Paul Younger Centre internal

STC-EU-NPowerhouse

How to provide feedback

If you have any questions about the works:

Provide feedback on immediate issues

If you have any immediate issues and would like to make an informal complaint, please email hebburnminewater@southtyneside.gov.uk or contact the Customer Contact Centre on 0191 427 7000.

The 兔子先生 project team will respond to your email and check to see if your issue can be resolved immediately.

Making a formal complaint

To make a formal complaint, either:

News and updates